ძებნა

Sl-01.Repairing And Renovation Of Sadarghat Highway Sub-Division -Ii Office Sl-02Emergent Restoration Of D/S River Bed Of Kunur Bridge At 9.40Km Of Panagarhillambazar Road By Sausage Wire Crate With Boulder Sl-03-Maintenance Of Left Out Portion Of Nh - 2 Adjacent To Panagarh Bypass Road From 513.500Kmp To 514.370Kmp And 514.430 Kmp To 515.100 Kmp By Dressing And Chilchalling Road Flanks Etc.Sl No-04-Maintenance Of G.T Road To Khana Junction Railway Station From 0.00 Km To 2.00 Km Dressing And Chilchalling Road Flanks Including Cutting And Filling Etc Sl No-05-Emergent Repairing Of Road Side Flanks Of Panagarh-Illambazar Road From 0.00 Km To 15.00 Kmp In Streches.

წინადადებების მოთხოვნა

ზოგადი ინფორმაცია

   სექტ 12, 2025
   ინგლისური
   სხვა
   გამოქვეყნებულია: სექტ 12, 2025

თავდაპირველი ტექსტი

50
NIT NIT No-4 of 2025-26-->

NIT: NIT No-4 of 2025-26

Download 1 -->


Download 2 -->




12/09/2025
A.E., Sadarghat Highway Sub-Division No. II, PW (Roads) Dte.

Sl-01.Repairing and Renovation of Sadarghat Highway Sub-Division -II office Sl-02Emergent Restoration of D/S river bed of kunur bridge at 9.40km of PanagarhIllambazar road by sausage wire crate
with boulder...
გაწევრიანების ვარიანტები

ბაზისური

სრული

კორპორაციული

$550/year

$1000/year

ხარჯი მოთხოვნითი

ყიდვა ყიდვა დაგვიკავშირდით
გთხოვთ გაითვალისწინოთ, რომ ეს შეტყობინება მხოლოდ თქვენთვისაა.
ჩვენ მაქსიმალურად ვცდილობთ, რომ ჩვენს ვებ-კვანძზე განთავსებული ინფორმაცია იყოს ზუსტი და განახლებული, ამავე დროს არ ვიძლევით გარანტიას, რომ მოცემული ინფორმაცია დაზღვეულია შეცდომებისაგან.
თუ თქვენ გაქვთ რაიმე შემოთავაზება ამ განაცხადის განახლებასთან/შესწორებასთან დაკავშირებით, გთხოვთ შეგვატყობინოთ.