ძებნა

Laying Gas Pipeline Using Open Cut And Hdd Method Of (1) Bankura Saltora Road From Ch.2.287Km To Ch. 2.300Km -13.0M, Ch.2.516Km To Ch.11.900Km -9.384 Km, Ch.14.340Km To Ch.19.340Km -05.00 Km And Ch. 19.440Km To Ch. 31.750Km -12.31Km, Total Length 26.707Km (Steel Pipeline), And Also From Ch. 2.287Km To Ch. 2.300Km -13.0M, And Ch.2.516Km To 5.287Km -2.771Km Of Bankura Saltora Road, Total Length-2.784 Km Mdpe Pipe Laying Along The Same Alignment Of Steel Pipeline Under Bankura Highway Division In The District Of Bankura.

წინადადებების მოთხოვნა

ზოგადი ინფორმაცია

   ნოემ 4, 2025
   ინგლისური
   სხვა
   გამოქვეყნებულია: ნოემ 4, 2025

თავდაპირველი ტექსტი

31
NIT e-NIT No. 16 of 2025-2026-->

NIT: e-NIT No. 16 of 2025-2026

Download -->




04/11/2025
Superintending Engineer(S. E.), Western Highway Circle-II, P. W. (Rds) Dte.

Laying Gas pipeline using Open Cut and HDD method of (1) Bankura Saltora road from Ch.2.287km to Ch. 2.300km -13.0m, Ch.2.516km to Ch.11.900km -9.384 km, Ch.14.340km to Ch.19.340km -05.00 km and Ch. 19.440km to...
გაწევრიანების ვარიანტები

ბაზისური

სრული

კორპორაციული

$550/year

$1000/year

ხარჯი მოთხოვნითი

ყიდვა ყიდვა დაგვიკავშირდით
გთხოვთ გაითვალისწინოთ, რომ ეს შეტყობინება მხოლოდ თქვენთვისაა.
ჩვენ მაქსიმალურად ვცდილობთ, რომ ჩვენს ვებ-კვანძზე განთავსებული ინფორმაცია იყოს ზუსტი და განახლებული, ამავე დროს არ ვიძლევით გარანტიას, რომ მოცემული ინფორმაცია დაზღვეულია შეცდომებისაგან.
თუ თქვენ გაქვთ რაიმე შემოთავაზება ამ განაცხადის განახლებასთან/შესწორებასთან დაკავშირებით, გთხოვთ შეგვატყობინოთ.